In the first article in this three-article series, I argued that speed doesn’t
necessarily sacrifice quality. Software can be developed faster and
better, with the help of efficient testing and quality assurance activities. I
listed the following ways of reducing the test cycle time and speeding the
overall delivery process:
1. managing testing like a "real" project
2. strengthening the test resources
3. improving system testability
4. getting off to a quick start
5. streamlining the testing process
6. anticipating and managing the risks
7. actively and aggressively managing the process
The first article in this series discussed points 1 and 2 in
the above list. This, the second article, will discuss points 3–5.
Later, the third article will finish the list, discussing points 6
and 7.
3. Improve System Testability
Build a cleaner system in the first place, so that less
test-debug-fix cycles of rework are needed. Several quality practices are
well known, which also help developers build cleaner systems: requirements
modeling, component reuse, defensive programming practices, code inspections,
unit testing, and source code control.
Establish test entry criteria. Obtain consensus from the project
manager and developers on the criteria that will be used to determine if the
system is ready to test, and the testware is ready.
Run a smoke test, and do not accept the system for testing until it
passes the smoke test. Waiting until the smoke test passes may appear to delay
the start of testing, but, if handled right, publicizing the fact that a smoke
test will be done can exhort the developers to greater efforts to meet the test
entry criteria.
Increase the early involvement of testers in the project. The testers
need to climb the learning curve early and have enough time to master the
system, determine how to test it, and prepare test cases and the test
environment. The testers should actively participate in developing the overall
project work plan.
This means that the testers need to be involved from the very beginning of
the project. If this does not happen, people who are relatively ignorant about
testing will commit the testers to unreasonable deadlines. The testers also will
not buy into the dates that are externally (and perhaps arbitrarily) imposed on
their testing efforts.
Ensure that the testers have a thorough understanding. They
need to understand
- the project goals and success factors
- the project context
- the system functionality
- the system risks and vulnerabilities
- the test equipment, procedures and tools
Use design for testability (DFT) reviews to instrument and place probes into
the system being tested, to increase observability. DFT is intended to
give black-box testers access to the hidden internal behavior of the system (and
sometimes this behavior can be very short-lived).
Encourage a common system architecture and component reuse. Though
these areas are not generally the primary concern of testers and QA analysts, a
common architecture across a family of systems and planned component reuse can
drastically shorten the test time and the overall development cycle time.
The development teams may be too busy or too partisan and involved to manage
the overall architecture and systems framework, and similarly too busy or too
partisan to manage a reusable component library. A better place to manage these
activities may well be the QA group.
Stabilize the system being tested as early as possible. Place the
system to be tested under change control and version control, and establish a
cutoff date beyond which no changes are allowed except emergency showstopper
fixes (the code freeze date).
Set the cutoff early, even if this means reducing functionality, in order to
allow a decent period of time after the fix for final testing and fixing of the
stabilized version (at least two weeks for small systems and at least one month
for large complex ones).
Stabilize and control the test environment. An argument can be made
that more stop-and-go interruptions of test execution are caused by gremlins in
the test environment than by any other cause. Ideally, the test environment
should be established and tested comfortably before it is needed. The test
environment should include tools to manage the test configuration, diagnose
problems in the environment, and easily reconfigure the environment from test to
test.
4. Get off to a Quick Start
Start the test planning early. As was mentioned earlier (it is worth
repeating), allow plenty of time up front in the project for the testers to
climb the learning curve, develop test cases, conduct peer reviews of test
cases, learn automated test tools, etc.
Ensure the right people are involved from the very beginning. To
ensure the right functional specs are written at the beginning of the project,
it is important to have the right talents and viewpoints on the project team.
Otherwise, much time is lost when the project has to be reengineered.
While team formation is the responsibility of the project leader, an
appropriate role for QA is to verify that the correct mix of marketers, customer
representatives, hardware engineers, documentation, and customer support reps
are involved.
Be proactive. Many test and QA groups operate reactively: they are so
busy with the test du jour that they have no spare time and energy to become
proactively involved in future projects during those projects' formative stages.
In other words, if you are currently involved for twelve hours a day testing
System A, you have no time to get involved early in System B, which currently is
being defined and which will be your next testing assignment after System A. It
takes foresight and adequate resources to cover both the test execution for
System A and the test planning for System B simultaneously.
Be organized and well prepared for the test. Involve the testers
early in reviewing the system requirements for testability. Set up and check out
the test facilities and test case automation early, in parallel with the system
development activities.
Remember the "push-pull" effect. Any efforts to prepare and build
test infrastructure must happen in the first third of the test duration; after
that, it is too late in the scramble to finish the project. Test automation
especially needs a long lead time, and is not feasible on test projects that are
done at the last moment.
5. Streamline the Testing Process
Automate more of the test cases. A test group at ADP, the large
information services firm, reports that they reduced the elapsed time for a
group of their testing projects by 60 percent through automation.
There is a danger here, however—most test automation efforts are not
effective, which imperils the timely delivery.
Use risk prioritization to focus the testing on the most critical
areas of the system. Use the concepts of risk-based testing to prioritize the
test cases and determine how much test coverage is sufficient. According to
research at Bellcore, the top 5 percent of the test cases uncover almost 50
percent of the defects, and the top 15 percent of the test cases uncover 75
percent of the defects.
Reuse test plans, templates, and test cases. The idea is to avoid
reinventing the wheel, to reuse known and field-tested test cases, and to
provide consistency across tests. In most cases, automation is a prerequisite
for reuse of test cases.
A coordinated, well-organized test case library or repository also is needed,
which means that a test librarian must be appointed. Expecting the test cases to
somehow organize themselves, or expecting a group of testers to somehow
coordinate a test library among their other busy demands, is naive.
How do we make decisions fast, and the right decisions? By (a) being
well-informed, up to date, and on top of things, (b) empowering the test team,
(c) centralizing decision-making authority in one person and making sure this is
the right person to be the team leader, and (d) making sure the team is
motivated by a sense of urgency.
The trick, of course, is to be responsive without disintegrating into
disorganized chaos, which can happen if there is too much change. At that point,
the better strategy is to try to stabilize the project and determine whether all
the changes to the project are really necessary.
Increase test throughput. Often, the amount of time expended just in
running the test cases can be a major source of delays. For example, the testers
may have older, slower equipment—the "hand-me-downs" from the
developers. Or there may be a shared environment, where the testers have to wait
for their turn, after developers, trainers, and others have finished with the
equipment.
There are many actions that can be taken to pump the same volume of test
cases through faster, thus decreasing the elapsed time to execute the suite of
test cases:
- If there are many contentions for resources in a shared test
environment, provide the testers with a dedicated test lab.
- In an expensive networked test environment, run the testing on three
shifts. That will cut the elapsed time by as much as two-thirds. Or
double the amount of equipment in the test lab, if that will halve the
test duration.
- On a mainframe, negotiate for more test partitions or resources
(though hopefully not on the Sunday night graveyard shift, which always
seems to be the most easily available time).
- On a workstation with an automated test tool, consider upgrading to a
more powerful, faster workstation.
- For manual testing, consider hiring contractors or temporary workers
to leverage the in-house testers. In the last situation, the test plans
and test cases have to be sufficiently clear and detailed for outsiders
to be able to follow them.
Start the test execution early (or at least on time). A major cause
for the late completion of testing projects is making a late start on the test
execution. Work with the developers to help them avoid delays in having a system
ready to test. Explore ways to start a partial test early with a prototype or
early version of the system, in parallel and overlapping the completion of
development.
This means the testing has to begin without a complete system to test, which
will influence when test cases can be run initially, and the sequence of
testing.
Also, employ entry criteria to determine whether a system delivered for
testing is in fact ready to test and avoid false starts. Entry criteria push
responsibility for delivering a testable system back to the developers, so they
may decrease the test time and at the same time increase the development time,
so that there is no overall net saving in elapsed time.
Test in parallel with the debugging and fixing. The easier way to run
a test project is to require that the system being tested is stable during each
test cycle: no changes are allowed during the test. However, this can lead to
long turnaround times to test, debug, and fix a version, especially if this test
cycle has to be repeated many times before the testing is done.
With overlapping testing and fixing, the turnaround time can be reduced. The
danger is that a test that was just executed may no longer run the same way
after the fix is introduced into the system. The fact that a test case worked
correctly before the change in no way guarantees that it will still pass after
the change.
In apparently unrelated (e.g., structurally decoupled), low-risk areas of the
system, where the chance of error propagation caused by a change is low, this
overlapping of testing and fixing can be acceptable.
Partly overlap the phases of testing. Traditional testing proceeds in
a linear sequence of phases from unit to integration to system to acceptance
testing. Unless the system is already unusually clean prior to testing (in which
case these phases can be hurried through), it is not a good idea to skip phases.
The purpose of the unit test, for example, is to ensure that each component is
as clean as feasible prior to the more complex multi-component integration and
system testing.
These phases can be overlapped to expedite the overall test process. With
careful coordination, the build and integration test could begin before the unit
test is 75 percent complete. The system test could begin when the integration
test is only 75 percent complete.
For example, partial builds and integration testing can proceed in parallel
with the completion of the unit testing. System testing can begin without all
components being ready and present in the system version under test. Acceptance
testing could proceed in parallel with the system test, provided the client
understands the system may appear more buggy than normal.
Move to a daily (or at least a more frequent) build cycle. Frequent
build cycles use incremental regression testing with a steadily increasing set
of automated regression test cases, and can encourage an earlier start to
integration testing.
Improve the coordination among the groups involved in the test,
debug, and fix cycles. Often unnecessary delays occur because of bureaucracy,
lack of coordination, and misunderstanding. The overall project manager and the
test manager should be on top of this, but often they are distracted by other
issues.
Empower the test & QA people by building a mutual respect between
these people and the ones who are building and maintaining the system. Not
listening to the advice of the testers often causes delays.
Limit the fixes to be made prior to system release. Restrict
fixes to the unambiguous showstoppers (severe problems), to reduce the rework
and retesting. Establish a process to review and approve the fixes that must be
made before the system is released, and minimize the number of retest cycles
before delivery.
Tighten version control and change control. Lack of adequate control
over changes and of system and component versions can lay waste to any schedule.
This control needs to be applied in development, in testing, and in the field.
It applies to platforms, configurations, and documentation as well as to the
software itself.
Either a software configuration manager (SCM) independent of both developers
and testers should perform this role, or if there is not a separate SCM, then
the QA group should undertake the responsibility. To assume that the developers
will simply coordinate versions among themselves is a fatal mistake.
Write problem reports that facilitate debugging and fixing, and don’t
impede it. A problem report is the mechanism that initiates the
follow-up debugging and fixing actions. An effective problem report is clear,
accurate, and useful to the person who will be doing the debugging.
Provide incentives for on-time completion of testing. Even if the
test project leader has to change the budget, it is a good idea to provide
incentives for timely work, such as a test retrospective review meeting on Kauai
or at least a jolly good free lunch for the test team.
Refresh the testers. Improve test productivity by periodically
sending the testers to expensive spas, to recharge their batteries and to show
you really love them.
Better yet, go yourself and leave them to finish the testing. This shows them
the rewards that can accrue when they are successful and get promoted to your
elevated rank in the organization.
Take training programs in the key software tools and the technical
environment. Ensure that everyone on the test team knows how to use the
equipment and tools. Even learning to type well can improve productivity.
Because of the push-pull effect, these training programs need to be taken early
in the project—beyond the first third of the project, it is too late.
Use technology smartly in order to improve productivity. Email, voice
mail, cell phones, and teleconferencing can be great time savers if used well.
Encourage proactive decision making within the test team. Empower
team members to make their own decisions wherever possible. This helps eliminate
bottlenecks caused by one person who insists on keeping all the power, or by
requiring approvals from the test project leader at every step along the way. In
other words, let the inmates run the asylum.
Make the feedback loop to the software engineers as fast as possible.
Test software quickly after it has been written or modified, and rapidly report
the test results to the authors while the code is still fresh in their minds.
The longer the code is allowed to age before testing and feedback, the more the
developers will have to become reacquainted with it and the more buggy the fixes
are likely to be.
Monitor and manage the lengths of queues, in order to minimize wait times.
Queues mean delays. They are caused by bottlenecks, which usually in turn
are caused by resource imbalances. For example, there could be a long queue of
problem reports, waiting for developers to work on them. Or there could be a
long queue of newly coded features, waiting for the testers to get to them.
Get the project done and worry about the paperwork later (or never).
Test now, focus on getting the most important bugs fixed quickly, and catch
up with the test case and test results documentation later.
Initiate a brainstorming session with the test team, to help identify
work-saving and streamlining measures. Sometimes useful ideas are
overlooked (and these ideas often appear obvious in hindsight), simply because
nobody asked.